Hi,
I am a new user of RORBWin. I am planning to design a dam for a project. I will appreciate if anyone can answer my below two questions. 1) how can I prepare S-Q Table? 2) how can I use a pump to spill water from dam
Thanks a lot in advance for a prompt response.
Cheers,
Sharif
Hi Sharif
Thanks for your query. There are several ways to set up a special storage in RORB. Typically, this is best done using an SQ table determined externally using a simple hydraulic calculation or a hydraulic model such as HEC-RAS. Alternatively, you can use the weir/pipe formulation within RORB to simulate the behaviour of various types of outlets.
In regards to a pump, you would need to incorporate this into an SQ table which was prepared externally.